Close
The page header's logo
UN Photo
Digital Asset Management System
Login
Staff Login
Register
0
Selected 
Invert selection
Deselect all
Deselect all
 Click here to refresh results
 Click here to refresh results
Go to Login page
 Hide details
play button
Linked assets
Steel workers hoist girder in place in Meeting Hall Area. Construction is scheduled to be completed in June 1951. 
[no date]
The temporary North Lawn building will house the General Assembly, conference facilities and the offices of the Secretary-General and staff during the renovations of United Nations Headquarters under the Capital Master Plan.
Erection of the steel framework for the 39-story Secretariat Building. The Building, which will contain the General Assembly Hall and a Conference Area in addition to office space, is expected to be ready for occupancy by the 3,000 members of the UN Secretariat in the autumn of 1950. Because of the narrowness (72 feet wide by 287 feet long) some of the largest wind braces ever developed will be used to keep the structure from swaying. Some of the concrete piers in which the steel is anchored extended forty feet into the earth. In addition to the Secretariat building the Permanent Headquarters will comprise two other units, plans for which are now nearing completion.
Two workmen climbing atop the first 20-foot riveted steel column erected, to unfurl the United Nations Flag.
doctype icon
Unique ID UN7ALB50395 
Action button
Conceptually similar
9e1.jpg
First Steel Column Erected for U.N. Permanent Headquarters 
04/19/1949 21:21:48 
Unique ID UN7478526 
70e.jpg
Large Mural by Swedish Artist to Decorate Penthouse of New Dag Hammarskjöld Library at UN Headquarters 
11/03/1961 15:08:20 
Unique ID UN7639091 
Action button
Similar tones
similar-image
similar-image
similar-image
similar-image
View images with similar tones
Action button
Headline First Steel Erected for United Nations 
Caption Description Erection of the steel framework for the 39-story Secretariat Building. The Building, which will contain the General Assembly Hall and a Conference Area in addition to office space, is expected to be ready for occupancy by the 3,000 members of the UN Secretariat in the autumn of 1950. Because of the narrowness (72 feet wide by 287 feet long) some of the largest wind braces ever developed will be used to keep the structure from swaying. Some of the concrete piers in which the steel is anchored extended forty feet into the earth. In addition to the Secretariat building the Permanent Headquarters will comprise two other units, plans for which are now nearing completion.
Two workmen climbing atop the first 20-foot riveted steel column erected, to unfurl the United Nations Flag. 
Unique Identifier UN7772068 
NICA ID 76192 
Production Date 04/19/1949 4:22:17 PM 
City/Location New York
Country United States of America
Credit UN Photo/Albert Fox
File size 2.40 MB